-
Oil Rig Drilling Rig Equipment Zj50DBS Oil Drilling Rig and Workover Rig
AC-DC-ACone to one
-
Model HTD8040D HPHT Consistometer for 2 cylinders
Technical Specification1The input voltageAC220V±5%;50Hz2The input power7.5KW3Maximum working pressure275MPa4Maximum operating temperature315ºC5Mixing speed150r/min6Scope of consistency0~100Bc7Heater power5KW8Ambient operating temperature0~50ºC9Compressed air700KPa 10Cooling water pr
-
Tz600 Triplex Mud Pump for Oil Drilling Rig
Main structural features:1. It is composed of three parts: power end, hydraulic end and reduction box;2. Adopting a unique design of the external gearbox design, the gearbox can be mounted on the left or right, and there are 16 different installation positions for optional installation, which is eas
-
Check Valve Coiled Tubing Tools Made in China
2 3/8" PACD97-4312-4003.125
-
Model XYM-2 Measurement Range 0.96-2.5 Mud Balance for Density Measuring
Basic Info. Model NO. XYM-2
-
Efb Erb Equalizing Check Valveefb/Erb Equalizing Check Valve
Basic Info. Model NO. EFB S
-
Xq29/2.6 1.8 Sucker Rod Power Tong for Workover Oil Well Service
ModelXQ28/1.8YXQ28/2.6YPipe size range of master tong5/8"-1-1/8"sucker rod, 1-7/8"-23/8" tubing5/8"-1-1/8" sucker rodPipe size range of backup tong5/8"-1-1/8"sucker rod, 1-7/8"-23/8" tubing5/8"-1-1/8" sucker rodHigh gear rated torque700N.M1